DAMAC Digital Johor JHB01
Hybrid Cooling
As digital transformation accelerates across industries, the need for resilient and scalable data center infrastructure continues to grow.
This project delivers a total GFA of 121,500 sqm with an overall IT load capacity of 110 MW, positioning it as a significant addition to regional digital infrastructure. The facility is designed to support high-performance computing environments while maintaining operational reliability, energy efficiency, and long-term adaptability to evolving technology demands.
The development emphasizes a balanced approach to capacity, efficiency, and resilience. Robust electrical and mechanical systems are planned to ensure stable operations under varying load conditions, while the overall design supports future technology upgrades and increasing compute densities. Careful consideration has been given to system redundancy, maintainability, and operational continuity to meet the expectations of mission-critical environments.
Beyond technical performance, the project reflects a forward-looking strategy that aligns infrastructure delivery with sustainability and lifecycle efficiency. By integrating scalable design principles with reliable engineering systems, the data center is well-positioned to support growing digital workloads and provide a dependable foundation for cloud services, enterprise applications, and emerging technologies.


