Malaysia MY07 Data Center Campus
Hybrid Cooling
Testing and commissioning are critical phases in any data center project. They validate that installed systems meet design intent, operate safely, and can support continuous operations under real-world conditions.
A structured commissioning process reduces risk by identifying issues early—before they impact uptime or operational performance. From individual component testing to integrated systems testing, every step plays a role in ensuring readiness.
Beyond system verification, commissioning also supports smoother handover to operations teams. Clear documentation, test results, and operational procedures provide confidence that the facility is ready for live environments.
By prioritizing testing and commissioning, data center owners can minimize downtime, reduce operational risk, and protect long-term investments.
In data center projects, value engineering may include alternative system configurations, equipment selection, or design optimization strategies that improve efficiency without reducing resilience. Energy performance, maintenance requirements, and system redundancy must all be considered.



